Medium priority: Planned engineering works Planned engineering works are now taking place from Shalesmoor to Malin Bridge and Middlewood until end of service on Saturday 31st October 2026.
Back to timetable results

26 Thurgoland - Penistone

Bus

Operated by South Pennine

Stops shown
Timing points are the main stops on the route, the ones the times are planned around. Choose All stops to see every stop.

Service Changes

Service 26: From Monday 29 June service 26 will have a revised timetable to operate a 2 hourly service throughout the day. The Saturday timetable is unaffected.

Loading timetable…

PDF Downloads

Download options