Medium priority: Planned engineering works Planned engineering works are now taking place from Shalesmoor to Malin Bridge and Middlewood until end of service on Saturday 31st October 2026.
Back to timetable results

207 Sheffield - Rotherham

Bus

Operated by First

Stops shown
Timing points are the main stops on the route, the ones the times are planned around. Choose All stops to see every stop.

From Monday 12 January, service 207 towards Sheffield will divert via Newhall Road, Brightside Lane, Corby Street and Fred Mulley Road.

Service 207 towards Rotherham is unaffected.

Loading timetable…

PDF Downloads

Download options